Kubernetes CO₂e per workload, cluster and region.
Estimated from CPU, memory and GPU energy, provider PUE, and each region’s grid carbon intensity (Ember 2024). Monthly and quarterly CSV export.
Carbon footprint · month to date
Run rate
28.4 t/mo
Annual
341 t
vs last month
8.4%
Emissions · 20 days
↑ rising
Energy
28.4 MWh
Intensity
4.8 kg/$1K
Grid
442 g/kWh
Top emitters
by workload · last 30d
Where you run
The same workload can emit 89× more CO₂e, depending on region.
Grid intensity runs from 8 g/kWh in eu-north-1 to 708 g/kWh in ap-south-1.
8g/kWh
eu-north-1
Sweden · hydro
130g/kWh
ca-central-1
Quebec · hydro
316g/kWh
eu-west-1
Ireland
322g/kWh
us-east-1
Virginia
442g/kWh
Global avg
Mixed grid
708g/kWh
ap-south-1
Mumbai · coal-heavy
Same workload, up to 89× the emissions. Region matters.
Source · Ember Climate · Global Electricity Review 2024
Method
What we count, and what we leave out.
Every figure is an estimate from a published model: CCF, SPECpower and Ember 2024.
Counted
4 componentsCPU compute energy
SPECpower curves, per processor family
Memory energy
0.3725 W per GiB, DDR4 baseline
GPU compute energy
TDP per model, utilization-weighted
Data-centre overhead
Provider PUE, which includes cooling and facility networking
Excluded
4 domainsNetwork transfer energy
Energy of moving data between sites
Embodied carbon
Manufacturing footprint of hardware
Storage device energy
Provider-side, not exposed by APIs
End-user device energy
Outside the data center boundary
Following the SCI specification and the Cloud Carbon Footprint methodology.
- CCF
- SPECpower
- Ember 2024
- Provider PUE
- SCI (ISO/IEC 21031:2024)
Reports
Monthly and quarterly CO₂e, exported as CSV.
CO₂e by cluster for the month or quarter. The methodology and constants are published.
Example · GreenOps report
Q2 2026
- prod-eu-11.42-8.1%
- prod-us-east2.18+4.4%
- staging-eu0.31-12.0%
Data sources: CCF, SPECpower, Ember 2024, provider PUE, SCI
Boundary: CPU, memory and GPU energy, plus data-centre overhead via provider PUE. Excludes network transfer, storage devices and embodied carbon.
Format: CSV, monthly or quarterly. Figures are estimates.
The report includes
Per-cluster breakdown
tCO₂e for each cluster in the period
Change over time
Each cluster against the previous period
Published methodology
CCF, SPECpower, Ember 2024, provider PUE and SCI: formulas and constants
Install in 5 minutes
Stop paying for unused capacity.
Free up to 100 vCPU. After that, $1.99 per vCPU per month, dropping to $0.60 at volume.